Apr. 18th, 2010

johnpalmer: (Default)
... Once you've rewired the furnace, you have to be ready to cut over to the new power. If there's any danger of rain, you have two choices: cut over before it rains, or leave the furnace on the old wiring until you can cut over.

Just sayin'.

On the "let's be kind" side, the contractors doing my house are not used to doing residential work.

On the "let's stop being a pushover," side, this is the second time since they've started this job that they've left me without heat.

Profile

johnpalmer: (Default)
johnpalmer

July 2025

S M T W T F S
  1 2 345
6789101112
13141516171819
20212223242526
2728293031  

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Aug. 26th, 2025 03:27 pm
Powered by Dreamwidth Studios