Apr. 18th, 2010

johnpalmer: (Default)
... Once you've rewired the furnace, you have to be ready to cut over to the new power. If there's any danger of rain, you have two choices: cut over before it rains, or leave the furnace on the old wiring until you can cut over.

Just sayin'.

On the "let's be kind" side, the contractors doing my house are not used to doing residential work.

On the "let's stop being a pushover," side, this is the second time since they've started this job that they've left me without heat.

Profile

johnpalmer: (Default)
johnpalmer

November 2025

S M T W T F S
      1
2345678
9101112131415
16 1718 19 202122
23242526272829
30      

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Dec. 1st, 2025 10:53 pm
Powered by Dreamwidth Studios